Air Testing in Lincoln – Air Permeability Services

Lincolnshire

Air Testing
Lincoln

Surrounding areas include:
Read Time: 1 minute(s)

Why Is Air Testing in Lincoln Important For New Builds?

Air testing Lincoln – If you’re looking for a professional in the Lincolnshire area to perform an Air Permeability test, you’re not alone. Many homes have poor indoor air quality and this affects everyone, especially those with asthma and allergies.

So why is air testing important for homes in the Lincoln area? Read on to learn more about air testing for new builds in Lincoln.

Looking for an Air Permeability test?

If you’re in need of an Air Permeability test for your new home, look no further than Ratio Seven Air Testing Services. Operating in Lincoln, Lincolnshire, they have many years of experience in this field and can ensure your new home meets all building standards.

Air permeability testing is an important part of the Building Regulations and can be carried out on any size structure or zone within it, including duct systems. The aim of the test is to reduce air leakage and increase energy performance. Air leakage will cause a building to lose heat and produce more carbon dioxide than it needs to. Therefore, it is essential that your building meets the standards for this test.

Air Permeability Testing Lincoln

Why is Airtightness Testing Important in Lincoln?

A recent school in Lincoln passed a whole building airtightness test, with a leakage rate of 0.126 cfm/sf at 75 pa. While this may sound like a modest number, it represents an improvement from previous tests. This is because the school has recently undergone a major expansion project that entailed adding new windows and a new roof.

Airtightness testing is an important part of a building’s design process. The testing process is diagnostic in nature and can pinpoint any problems before the construction process begins. If a building is not airtight, remedial work can be undertaken to resolve the problem. In addition, airtightness testing is required prior to major energy efficiency retrofits.

How is an Air Tightness Test Performed?

The process of air tightness testing involves sealing off the internal and external air passages of the building. This means that mechanical fans, chimney flues and air combustion vents are temporarily sealed. A qualified air tester installs blower doors inside the building and measures pressure differences between the interior and exterior environment. Once the test is completed, the air tester extracts the air from the building using calibrated fan units.

The test is a necessary part of any building construction project. It measures air leakage through the building’s fabric and determines where improvements can be made. If the air leakage rate is too high, it can decrease the energy efficiency of the building and affect its comfort. An air tightness test is necessary to ensure the energy efficiency of the building, reduce environmental impact and save money on energy bills.

Looking for Lincoln Air testing & Air Permeability testing contact us now.

Air Testing for New Builds in Lincoln

When a developer is designing a new build development, it is important to consider the impact of air tightness on the project. The best way to ensure that the development will meet the required standards is to conduct air tightness testing during the planning stage. This way, recommendations can be made early on in the project to ensure that there is minimum air leakage, minimum heat loss, and maximum compliance with Building Regulations. While this can be a time-consuming and expensive process, a reliable team will be able to provide recommendations and best practice. After the development has gone through air tightness testing, the client is required to check for sealant compliance, which is essential to ensure the property passes the test.

In order to meet Building Regulations (British Standards), all new developments must undergo an air test. The air test is part of Approved Document Part L (part L1A for domestic properties) and must be conducted before the occupier moves in. The results of the air test are used to calculate the overall energy rating of a building.

Commercial Air Testing in Lincolnshire

The purpose of air testing is to ensure that a building is built to a standard that does not cause harmful air pollution. In order to meet these standards, a building must have an air permeability rating lower than eight m3/h/m2, and a pressure differential of 50 pascals. It is important to note that poor air tightness is responsible for up to 40% of heat loss. This is why it is imperative for new developments to have a final air test performed before the occupier moves in. Moreover, the results of an air test are used to determine the building’s overall energy rating, which varies from building to building.

Get a FAST FREE Quotation